↓ Skip to Main Content

RV12 Build Log

Main Navigation

  • Home
  • Build Log
  • Avionics
  • Firewall Forward
  • Propeller
  • Vinyl Wrap
  • Videos
  • Other
    • The Plane
    • Engine Options
    • Links
    • Notes
    • Tools
    • Inspection
    • Modifications
  • Contact me

Home » Build Log

Vertical Stab – Finished

By admin Posted on January 2, 2015 Posted in Uncategorized No Comments

Vertical stab is finally completed with hinges and forward skin attached. Boelube on screws helps a lot attaching the forward skin. Could not find how much torque is required for the hinges bolts. The bolts go into nutplates. They seem …

Vertical Stab – Finished Read more »

Vertical Stab – Skin Riveting

By admin Posted on January 1, 2015 Posted in Uncategorized No Comments

First day of 2015! Happy New Year everyone!!! Replace the crooked rivets on the nut-plate mentioned in the previous post. Clecoed the skin to the skeleton and riveted the skin. Finally I have some components that look like aircraft’s parts …

Vertical Stab – Skin Riveting Read more »

Vertical Stab – Skin. Attaching nutplates

By admin Posted on December 29, 2014 Posted in Uncategorized No Comments

Had a couple of hours attaching nutplates to the vertical stabilizer skin. have done most of them. Considering drilling out one of the bottom nutplate and re-doing the rivets as I’m not quite happy with the way rivets got squeezed. The …

Vertical Stab – Skin. Attaching nutplates Read more »

Vertical Stab – Skin preparation

By admin Posted on December 28, 2014 Posted in Uncategorized No Comments

Spend couple of hours preparing the Vertical stab skins. De-burring, drilling and dimpling. Nothing fancy. Had to modify the standard 3/32 dimple dies to get nutplates dimpled without damaging the central part of them. Their ears appear to be warped …

Vertical Stab – Skin preparation Read more »

Vertical Stab – Skeleton completed

By admin Posted on December 27, 2014 Posted in Uncategorized No Comments

Thanks to Christmas, I have finally got some time for my plane. Went all the way from page 06-03 to page 06-05 All the components come together really well. The DVD I bought from www.homebuilthelp.com comes really handy. Found it challenging …

Vertical Stab – Skeleton completed Read more »

Vertical Stab – rear spar

By admin Posted on November 17, 2014 Posted in Uncategorized No Comments

Started building Vertical Stab rear spar. Cut and deburried some components. Ready for drilling

Vertical Stab hinges

By admin Posted on November 16, 2014 Posted in Uncategorized No Comments

The building has started I put together the vertical stab hinges. First error – I used wrong rivets (shorter) on one of the hinges. Spend 1.5 hours to remove the rivets and put the right ones. It most probably would …

Vertical Stab hinges Read more »

Unpacking and Inventory

By admin Posted on November 15, 2014 Posted in Uncategorized No Comments

Unpacked and inventoried all the content of the crate. Had to build an overhead shelf to store long pieces of the tail skin.

Tail kit has arrived

By admin Posted on November 11, 2014 Posted in Uncategorized No Comments

The tail kit has arrived. I’ve ordered air-freight, but good people from DHL mixed something up and sent it by boat. It took 6 weeks instead of two to get to Australia. Errare Humanum Est Most importantly the kit is …

Tail kit has arrived Read more »

The beginning…

By admin Posted on September 30, 2014 Posted in Uncategorized 1 Comment

The tail kit is ordered. DHL people promised to take good care of it and deliver the crate to Australia within 2 weeks. Waiting impatiently

Posts pagination

Previous 1 … 15 16 17

Recent Posts

  • iPad Cooling Solution
  • First Flight
  • Ignition problem
  • Cooler box assembly
  • Engine installation

Archives

  • January 2023
  • July 2021
  • April 2021
  • November 2020
  • October 2020
  • April 2020
  • March 2020
  • December 2019
  • January 2019
  • December 2018
  • July 2018
  • December 2017
  • November 2017
  • October 2017
  • August 2017
  • May 2017
  • April 2017
  • February 2017
  • January 2017
  • July 2016
  • June 2016
  • May 2016
  • April 2016
  • March 2016
  • February 2016
  • January 2016
  • December 2015
  • November 2015
  • October 2015
  • August 2015
  • June 2015
  • May 2015
  • April 2015
  • March 2015
  • February 2015
  • January 2015
  • December 2014
  • November 2014
  • September 2014

Categories

  • Uncategorized

Footer Menu

  • Home
  • Build Log
  • Avionics
  • Firewall Forward
  • Propeller
  • Vinyl Wrap
  • Videos
  • Other
  • Contact me
Copyright © 2026 RV12 Build Log | Powered by Responsive Theme