Fuselage – WD-1210 control column

By admin Posted on December 30, 2015 Posted in Uncategorized No Comments

Bolted the WD-1210 control column. had to use 2 full thickness washes on each side, super-glued together. Tightened the nuts with 25 lb-in torque Spend 1 hour

Fuselage – Bulkhead assembly completion

By admin Posted on December 26, 2015 Posted in Uncategorized No Comments

Mainly worked on F-1203A Attached doublers and dozens of nutplates  Attached the F-1203A to the rest of the fuse, riveted it. Riveted the seat rump floor panels. Attached a lot of nutplates. Everything is straight forward here. Just a lot of small …

Fuselage – Bulkhead assembly completion Read more »

Fuselage – Bulkhead assembly

By admin Posted on December 15, 2015 Posted in Uncategorized No Comments

Completed work up to page 21-11 It took a while to get F-1203A bulkhead deburred and ready – so many holes, it is crazy! Attached the control column mounts and stub spar recepticals Spend 4 hours. There is about 2 more …

Fuselage – Bulkhead assembly Read more »

Fuselage – Control column mount

By admin Posted on December 8, 2015 Posted in Uncategorized No Comments

Prepared the Control column mount components along with some other small bits. Riveted the Control column mount bits together. Double flush riveting represented a bit of a challenge. The AN426AD4-6 rivets are a bit too long to form a nice flush shop …

Fuselage – Control column mount Read more »

Fuselage – Bulkhead caps and rollers

By admin Posted on December 5, 2015 Posted in Uncategorized No Comments

Attached bulkhead caps and the wing spar rollers. Pretty straightforward task. Page 21-09 completed Spend 1 hour

Fuselage – Seat floor assembly

By admin Posted on December 4, 2015 Posted in Uncategorized No Comments

Attached seat floor to the seat ribs and then both sides of the seat floor to the baggage assenbly Completed seet floor assembly Pages 21-08 and 21-07 are completed Spend 8 hours

Recent Posts

  • iPad Cooling Solution
  • First Flight
  • Ignition problem
  • Cooler box assembly
  • Engine installation

Archives

  • January 2023
  • July 2021
  • April 2021
  • November 2020
  • October 2020
  • April 2020
  • March 2020
  • December 2019
  • January 2019
  • December 2018
  • July 2018
  • December 2017
  • November 2017
  • October 2017
  • August 2017
  • May 2017
  • April 2017
  • February 2017
  • January 2017
  • July 2016
  • June 2016
  • May 2016
  • April 2016
  • March 2016
  • February 2016
  • January 2016
  • December 2015
  • November 2015
  • October 2015
  • August 2015
  • June 2015
  • May 2015
  • April 2015
  • March 2015
  • February 2015
  • January 2015
  • December 2014
  • November 2014
  • September 2014

Categories

  • Uncategorized

Footer Menu

  • Home
  • Build Log
  • Avionics
  • Firewall Forward
  • Propeller
  • Vinyl Wrap
  • Videos
  • Other
  • Contact me
Copyright © 2026 RV12 Build Log | Powered by Responsive Theme