Fuselage – Bulkhead assembly completion
Mainly worked on F-1203A
Attached doublers and dozens of nutplates Attached the F-1203A to the rest of the fuse, riveted it. Riveted the seat rump floor panels.
Attached a lot of nutplates.
Everything is straight forward here. Just a lot of small pieces that take time
Prepared and inserted WD-1210 control column. Angle collet drill has come really handy for opening the holes.
Pages 21-12 and 21-13 are completed
Spend 4 hours
Leave a Reply