Tailcone – Skins preparation
Page 10-02
Skin preparation started. Lots of blue plastic removing, and deburring and breaking the edges.
The biggest challenge is to manage all these large pieces of sheet metal. I need larger garage.
The skin preparation is not only boring, it is also time consuming. Despite of all the fancy deburing tools at my disposal it took me 2 hours to prepare the top skin F-1278 (remove plastic, deburr holes and edges and break the edges)
Leave a Reply