Fuselage – Step ribs and further
Happy New Year!
It was a hot day and I was a bit tired after a night out with the family.
Prepared the step ribs
Dimpled two of them (inboard ones) on the wrong side despite of double and triple checking. Had to un-dimple them with the flat dies and dimple the right side.
Riveted the ribs. – all manual riveting.
Prepared and clecoed the F-1202F Bulkhead.
Inserted the plastic bushings.
Page 21-14 is done.
Also prepared the fuselage corner skins.
Spend 5 hours
Leave a Reply