Fuselage – 1207B bottom bulkhead
I’m holding off bottom skin installation awaiting TC inspection and preparing components required after I have the skin installed
Prepared the 1207B bulkhead for installation.
Spend 1 hour
I’m holding off bottom skin installation awaiting TC inspection and preparing components required after I have the skin installed
Prepared the 1207B bulkhead for installation.
Spend 1 hour
Leave a Reply