Fuselage – Roll Bar
Started working on the roll bar assembly Lots of drilling and deburring 4 hours spent so far
Started working on the roll bar assembly Lots of drilling and deburring 4 hours spent so far
While waiting for my TC to inspect what I’ve done so far I decided to prepare parts for Section 23 Following components have been prepared today Rollbar attach plate – F-1205B Midfuse brace F-1205A and F-1205C Armrest brackets – F-1202E, …
Completed the work on steps attach brackets and riveted forward bulkhead. also attached rear baggage bulkhead with the autopilot brackets on it. Spend 3 hours
Prepared step brackets/stiffeners/angles, match-drilled them. Will continue tomorrow. The operation turned out to be much easier with the bottom skin off. Hopefully I did not screw-up anything by doing this step out of prescribed order (bottom skin on). Page 21-17 completed …
Fuel flow bracket prepared and riveted. Spend 1 hour
Assembled rudder pedal attach channels, attached the diagonal stiffener and spend fair bit of time on gascollator attach points. This section 22 is quite tricky to read Now I need to get some Proseal fuel tank sealant. It looks like …
Happy Australia Day everyone!!! Put together forward section of the fuselage – the section where firewall start. Completed page 22-02 Spend 4 hours
I’m holding off bottom skin installation awaiting TC inspection and preparing components required after I have the skin installed Started preparing parts for forward lower fuselage – Section 22 the section 22 is a bit tricky to read. So I managed …
Fuselage – Preparing parts for FWD Lower fuselage Read more »
I’m holding off bottom skin installation awaiting TC inspection and preparing components required after I have the skin installed Prepared the 1207B bulkhead for installation. Spend 1 hour
finished preparing the bottom skin, attached nut plates and broke the edges. Ready to rivet. Will probably wait for TC inspection. Prepared F1213 step floor panels. Spend 2 hours