Turtle deck painted
Page 25-06 Prepped and painted the both parts of turtle decks F1277R and F1277L Spent 4 hrs
Page 25-06 Prepped and painted the both parts of turtle decks F1277R and F1277L Spent 4 hrs
Pages 35-05 and 35-06 made and installed brake lines on the main gear legs The way the lines attached to the main gear legs looks kinda ugly. I’ll address this cosmetics later. Spent 4Hrs